Environmental Impact Report


The Ontario Plan Final Environmental Impact Report

SECTION 1  INTRODUCTION
SECTION 2  RESPONSE TO COMMENTS
SECTION 3  REVISIONS TO THE DRAFT EIR
APPENDIX A  PUBLIC SCOPING HEARING ATTENDEES
APPENDIX B  TRAFFIC MODELING
APPENDIX C  AHWAHNEE WATER PRINCIPLES
APPENDIX D  TRAFFIC MEMORANDUM
APPENDIX E CHANGES TO DRAFT ENVIRONMENTAL IMPACT REPORT
MITIGATION MONITORING PROGRAM

Re-Circulated Portions of The Ontario Plan Draft Environmental Impact Report

NOTICE OF AVAILABILTIY NOTICE OF COMPLETION
FRONT COVER AND TABLE OF CONTENTS
1      EXECUTIVE SUMMARY
2 ENVIRONMENTAL ANALYSIS – GLOBAL CLIMATE CHANGE
3 ADDITIONAL PROJECT ALTERNATIVE – 15 PERCENT GHG REDUCTION ALTERNATIVE
BIBLIOGRAPHY
APPENDIX A – GHG MEMORANDUM

The Ontario Plan Draft Environmental Impact Report

NOTICE OF AVAILABILITY
NOTICE OF COMPLETION
FRONT COVER AND TABLE OF CONTENTS
CH 01 EXECUTIVE SUMMARY
Figure 1-1 Regional Vicinity
Figure 1-2 Citywide Aerial
Figure 1-3 Proposed Land Use Plan
CH 02 INTRODUCTION
CH 03 PROJECT DESCRIPTION
Figure 3-1 Regional Vicinity
Figure 3-2 Citywide Aerial
Figure 3-3 Local Vicinity
Figure 3-4 Generalized and Focus Areas
Figure 3-5 Current Land Use Plan
Figure 3-6 Proposed Land Use Plan
CH 04 ENVIRONMENTAL SETTING
Figure 4-1 Existing Land Uses
CH 05 ENVIRONMENTAL ANALYSIS
5.1 Aesthetics
Figure 5.1-1 Neighborhoods/Districts
5.2 Agricultural Resources
Figure 5.2-1 Important Farmland
Figure 5.2-2 Williamson Act Contract Lands
5.3 Air Quality
5.4 Biological Resources
Figure 5.4-1 Areas of Potential Occurrence of Sensitive Species
Figure 5.4-2 Vegetation Associations and Land Cover
5.5 Cultural Resources
Figure 5.5-1 Historic Districts
Figure 5.5-2 Surveyed Archeological Resources
5.6 Global Climate Change(See Re-Circulated Draft EIR)
5.7 Geology and Soils
Figure 5.7-1 Geologic Map
Figure 5.7-2 Regional Faults
Figure 5.7-3 Areas of Liquefaction Susceptibility
5.8 Hazards and Hazardous Materials
Figure 5.8-1 Airport Land Use Compatibility
Figure 5.8-2 Historical Fires in Ontario
5.9 Hydrology and Water Quality
Figure 5.9-1 Chino Watershed
Figure 5.9-2 Flood Hazards Areas
Figure 5.9-3 Chino Groundwater Basin
Figure 5.9-4 Areas of Impaired Water Quality in the Chino Groundwater Basin
5.10 Land Use and Planning
Figure 5.10-1 Redevelopment Areas
5.11 Mineral Resources
Figure 5.11-1 Mineral Resource Zones
5.12 Noise
Figure 5.12-1 Existing Noise Levels in Ontario from Surface Transportation
Figure 5.12-2 Existing 65 dBA CNEL Train Noise Contour
Figure 5.12-3 Airport Noise Contours
Figure 5.12-4a 94 dBA Sound Exposure Level for Various Aircraft
Figure 5.12-4b 94 dBA Sound Exposure Level for Various Aircraft
Figure 5.12-5 Noise Monitoring Locations
Figure 5.12-6 Future Noise Levels in Ontario from Surface Transportation
Figure 5.12-7 2035 65 dBA CNEL Train Noise Contour
Figure 5.12-8 Increase Surface Transportation Noise Levels at Buildout 2035
5.13 Population and Housing
5.14 Public Services
Figure 5.14-1 Police and Fire Station Locations
Figure 5.14-2 Ontario School Districts
Figure 5.14-3 Ontario Public Libraries
5.15 Recreation
Figure 5.15-1 Existing and Proposed Park Facilities
Figure 5.15-2 Multipurpose Trails and Bikeway Corridor Plan
5.16 Transportation and Traffic
Figure 5.16-1 Existing Truck Routes
Figure 5.16-2 Existing Rail Lines within the City of Ontario
Figure 5.16-3 Existing Transit Routes and Transfer Centers
Figure 5.16-4 CMP Road System
Figure 5.16-5 Existing Number of Lanes on Master Plan Roadways
Figure 5.16-6 Study Area Intersections
Figure 5.16-7 Existing AM Peak Hour Intersection Level of Service
Figure 5.16-8 Existing PM Peak Hour Intersection Level of Service
Figure 5.16-9 Functional Roadway Classification Plan
Figure 5.16-10 Proposed Truck Routes and Railroad Grade Separation
Figure 5.16-11 Proposed Land Use Plan AM Peak Hour Intersection LOS
Figure 5.16-12 Proposed Land Use Plan PM Peak Hour Intersection LOS
Figure 5.16-13 Proposed Transit System
5.17 Utilities and Service Systems
CH 06 SIGNIFICANT UNAVOIDABLE ADVERSE IMPACTS
CH 07 ALTERNATIVES TO THE PROPOSED PROJECT(See Re-Circulated Draft EIR)
CH 08 IMPACTS FOUND NOT TO BE SIGNIFICANT
CH 09 SIGNIFICANT IRREVERSIBLE CHANGES DUE TO THE PROPOSED PROJECT
CH 10 GROWTH-INDUCING IMPACTS OF THE PROPOSED PROJECT
CH 11 ORGANIZATIONS AND PERSONS CONSULTED
CH 12 QUALIFICATIONS OF PERSONS PREPARING EIR
CH 13 BIBLIOGRAPHY
APPENDIX A NOTICE OF PREPARATION& INITIAL STUDY
APPENDIX B NOP RESPONSES
APPENDIX C EXISTING CONDITIONS REPORT
APPENDIX D AIR QUALITY MODELING DATA
APPENDIX E BIOLOGICAL RESOURCES REPORT
APPENDIX F ECI TECHNICAL BACKGROUND REPORT
APPENDIX G NOISE MODELING DATA
APPENDIX H TRAFFIC STUDY
APPENDIX I WATER-SEWER-DRAINAGE STUDIES
APPENDIX J LAND USE MODELING METHODOLOGY