The Ontario Plan Final Environmental Impact Report SECTION 1 INTRODUCTION SECTION 2 RESPONSE TO COMMENTS SECTION 3 REVISIONS TO THE DRAFT EIR APPENDIX A PUBLIC SCOPING HEARING ATTENDEES APPENDIX B TRAFFIC MODELING APPENDIX C AHWAHNEE WATER PRINCIPLES APPENDIX D TRAFFIC MEMORANDUM APPENDIX E CHANGES TO DRAFT ENVIRONMENTAL IMPACT REPORT FIGURES MITIGATION MONITORING PROGRAM Re-Circulated Portions of The Ontario Plan Draft Environmental Impact Report NOTICE OF AVAILABILTIY NOTICE OF COMPLETION FRONT COVER AND TABLE OF CONTENTS 1 EXECUTIVE SUMMARY 2 ENVIRONMENTAL ANALYSIS – GLOBAL CLIMATE CHANGE 3 ADDITIONAL PROJECT ALTERNATIVE – 15 PERCENT GHG REDUCTION ALTERNATIVE BIBLIOGRAPHY APPENDIX A – GHG MEMORANDUM Draft Environmental Impact Report NOTICE OF AVAILABILITY NOTICE OF COMPLETION FRONT COVER AND TABLE OF CONTENTS CH 01 EXECUTIVE SUMMARY Figure 1-1 Regional Vicinity Figure 1-2 Citywide Aerial Figure 1-3 Proposed Land Use Plan CH 02 INTRODUCTION CH 03 PROJECT DESCRIPTION Figure 3-1 Regional Vicinity Figure 3-2 Citywide Aerial Figure 3-3 Local Vicinity Figure 3-4 Generalized and Focus Areas Figure 3-5 Current Land Use Plan Figure 3-6 Proposed Land Use Plan CH 04 ENVIRONMENTAL SETTING Figure 4-1 Existing Land Uses CH 05 ENVIRONMENTAL ANALYSIS 5.1 Aesthetics Figure 5.1-1 Neighborhoods/Districts 5.2 Agricultural Resources Figure 5.2-1 Important Farmland Figure 5.2-2 Williamson Act Contract Lands 5.3 Air Quality 5.4 Biological Resources Figure 5.4-1 Areas of Potential Occurrence of Sensitive Species Figure 5.4-2 Vegetation Associations and Land Cover 5.5 Cultural Resources Figure 5.5-1 Historic Districts Figure 5.5-2 Surveyed Archeological Resources 5.6 Global Climate Change (See Re-Circulated Draft EIR) 5.7 Geology and Soils Figure 5.7-1 Geologic Map Figure 5.7-2 Regional Faults Figure 5.7-3 Areas of Liquefaction Susceptibility 5.8 Hazards and Hazardous Materials Figure 5.8-1 Airport Land Use Compatibility Figure 5.8-2 Historical Fires in Ontario 5.9 Hydrology and Water Quality Figure 5.9-1 Chino Watershed Figure 5.9-2 Flood Hazards Areas Figure 5.9-3 Chino Groundwater Basin Figure 5.9-4 Areas of Impaired Water Quality in the Chino Groundwater Basin 5.10 Land Use and Planning Figure 5.10-1 Redevelopment Areas 5.11 Mineral Resources Figure 5.11-1 Mineral Resource Zones 5.12 Noise Figure 5.12-1 Existing Noise Levels in Ontario from Surface Transportation Figure 5.12-2 Existing 65 dBA CNEL Train Noise Contour Figure 5.12-3 Airport Noise Contours Figure 5.12-4a 94 dBA Sound Exposure Level for Various Aircraft Figure 5.12-4b 94 dBA Sound Exposure Level for Various Aircraft Figure 5.12-5 Noise Monitoring Locations Figure 5.12-6 Future Noise Levels in Ontario from Surface Transportation Figure 5.12-7 2035 65 dBA CNEL Train Noise Contour Figure 5.12-8 Increase Surface Transportation Noise Levels at Buildout 2035 5.13 Population and Housing 5.14 Public Services Figure 5.14-1 Police and Fire Station Locations Figure 5.14-2 Ontario School Districts Figure 5.14-3 Ontario Public Libraries 5.15 Recreation Figure 5.15-1 Existing and Proposed Park Facilities Figure 5.15-2 Multipurpose Trails and Bikeway Corridor Plan 5.16 Transportation and Traffic Figure 5.16-1 Existing Truck Routes Figure 5.16-2 Existing Rail Lines within the City of Ontario Figure 5.16-3 Existing Transit Routes and Transfer Centers Figure 5.16-4 CMP Road System Figure 5.16-5 Existing Number of Lanes on Master Plan Roadways Figure 5.16-6 Study Area Intersections Figure 5.16-7 Existing AM Peak Hour Intersection Level of Service Figure 5.16-8 Existing PM Peak Hour Intersection Level of Service Figure 5.16-9 Functional Roadway Classification Plan Figure 5.16-10 Proposed Truck Routes and Railroad Grade Separation Figure 5.16-11 Proposed Land Use Plan AM Peak Hour Intersection LOS Figure 5.16-12 Proposed Land Use Plan PM Peak Hour Intersection LOS Figure 5.16-13 Proposed Transit System 5.17 Utilities and Service Systems CH 06 SIGNIFICANT UNAVOIDABLE ADVERSE IMPACTS CH 07 ALTERNATIVES TO THE PROPOSED PROJECT (See Re-Circulated Draft EIR) CH 08 IMPACTS FOUND NOT TO BE SIGNIFICANT CH 09 SIGNIFICANT IRREVERSIBLE CHANGES DUE TO THE PROPOSED PROJECT CH 10 GROWTH-INDUCING IMPACTS OF THE PROPOSED PROJECT CH 11 ORGANIZATIONS AND PERSONS CONSULTED CH 12 QUALIFICATIONS OF PERSONS PREPARING EIR CH 13 BIBLIOGRAPHY APPENDIX A NOTICE OF PREPARATION & INITIAL STUDY APPENDIX B NOP RESPONSES APPENDIX C EXISTING CONDITIONS REPORT APPENDIX D AIR QUALITY MODELING DATA APPENDIX E BIOLOGICAL RESOURCES REPORT APPENDIX F ECI TECHNICAL BACKGROUND REPORT APPENDIX G NOISE MODELING DATA APPENDIX H TRAFFIC STUDY APPENDIX I WATER-SEWER-DRAINAGE STUDIES APPENDIX J LAND USE MODELING METHODOLOGY